Former Coke Plant

Former Coke Operation and By-Products plant located on 170 acres located adjacent to the Hackensack River.

Despite an expanded scope in terms of groundwater sampling and reporting level of effort, FTS has been able to reduce overall annual OM&M costs by 20% from the start of the project. This was accomplished through staff efficiency, vendor negotiations, and on-site equipment repair and maintenance.

FTS annual site operations and maintenance activities include:

    Hydraulic containment

    NAPL recovery (5,000 gallons)

    Treatment of 1,600,000 gallons of groundwater (combined phase groundwater and DNAPL is recovered and processed through a clarifier and oil water separator prior to reinjection)

    Groundwater sampling (72 wells)

    Preparation of associated groundwater reports